The Boulderboard Pro ships in 5 boxes via UPS. International ocean shipments are fully palletized on one export pallet. The heaviest individual part is about 40 pounds. All parts can fit through standard doors and can easily be carried up and down stairs.

Installation of a Boulderboard Pro takes 1 person about an hour and requires some experience with basic hand tools. 

You will need the following tools:

WRENCHES:

1 - 9/16 open end wrench

1 – 9/16 socket

1 – socket wrench 

1 – allen set, SAE

1 – crescent or universal wrench

SCREWDRIVERS:

– Set of screwdrivers

– Cordless drill or screwdriver

2 – Phillips driver bits for drill